Construction on the Aquatic Center was completed in June of 1999 at a total cost of  1.5 million dollars. The Aquatic Center features a 181 foot water slide, six lap swim lanes, one diving board, a drop slide, zero-depth entry with three water features, large sun deck, a concessions area & much more fun & excitement for everyone.